TOP
Cementing Staged Fracturing Technology of AT-Port-Well Completion
Overview

Antonoil AT-port is an cemented fracture completion system. This process ,need the normal cementing procedure used cooperate plug, and pressure open the bottom sleeve and stimulating, then drop ball to open other sleeve and stimulating. It is easy to operation.

Talk with anton expert
1. One trip to cementing and fracturing ,saving time and cost.
2. Tools with 4.5 in and 5.5 in base pipe can be used in 6 in and 8.5 in open hole, the max stage is 12.
3. Ball seat is drillable. The ID of ball seat is bigger and can be used to product directly.
4. The min OD of ball is 2.25 in.
5. After drilling ball seat, the ball sleeve can be opened and closed repeatedly.
You might also like
Previous Previous
Feedback
Submit