Anton real-time iterative fracturing technology is an integrated application of geological engineering integration and intelligent fracturing technology. This technology combines software simulation, hardware monitoring and targeted analysis methods, which can effectively achieve the goal of ' real-time analysis of fracturing, fine control of process, deepening evaluation of effect ', so as to maximize the volume of reservoir reconstruction and maximize the benefits.

Talk with anton expert
1. Refinement: Minimum unit fracturing control, accurate to single segment / single cluster, throughout the whole well, to achieve ' fine fracturing design ' to ' fine fracturing process control ;

2. Dynamic: The traditional geological static mode is transformed into a dynamic real-time iterative mode with the response of fracturing construction, and the analysis results are more accurate;

3. Visualization: It can also provide customized technical solutions, supporting diversified visual monitoring methods for fracturing, so that the project execution can be visualized in high-definition and visual fine fracturing can be realized;

4. Scientize: The tacit knowledge of experts with rich fracturing experience will be explicit, and the knowledge results can be copied, from ' individual experience decision ' to ' collective scientific decision '.
Anton real-time iterative fracturing technology is an integrated application of geological engineering integration and intelligent fracturing technology. It has been applied in nearly 100 wells in China and achieved remarkable results;
1.In July 2021, XX Company carried out the field practice of fine fracturing control in two wells together with Anton after extensive investigation. The results show that the goal of cost reduction and efficiency increase can be achieved through ' fine tracking and optimization of the whole process of fracturing ;

2.XX Company and Anton Petroleum have built a ' Fracturing Optimization Center ' in 2022, referred to as ' FOC '. The main purpose is to improve the level of fracturing and improve the effect of fracturing through the fine fracturing control system of ' real-time analysis of fracturing, fine control of process and deepening evaluation of effect ;

3.In coordination with the geological, engineering and on-site construction management departments, through fine parameter adjustment, casing deformation and pressure channeling prevention and control, in 2022, it will help XX company to save more than 10 million fracturing construction costs, and the EUR per well will be increased by 18 %;

4.Xinjiang Oilfield Jimsar, Tuha Oilfield and other successive work preparation......