Feedback
TOP
Top Gravel Pack Sand Control Technical Services
Overview

The Top Filling Sand Control Technology Service uses top-filling tools to complete the entire process of setting the packer, seal testing, releasing, and filling in a single trip of the pipe string. Anton provides top filling technology services and supporting tools for conventional casing completion well types.

Talk with anton expert
Forward release, no need to find the neutral point, direct downward pressure positioning;
Ensures that the pipe string does not shift during operation with the 'shock isolation mechanism,' preventing sand leakage due to pressure fluctuations.
Large-displacement and high-sand-volume fracturing and blockage removal enhance the conductivity of the near-wellbore area, increasing oil well production;
Effectively solves the problem of proppant backflow and fracture closure after fracturing, extending the production cycle of the oil well.

In Xinjiang Oilfield, the squeeze filling sand control technology has been applied in more than 450 wells, successfully completing the overall sand control for this block with a 100% success rate. The average effective period exceeds 900 days, and some wells have seen an increase in daily production due to the gravel packing and blockage removal effect, earning unanimous praise from the clients.
You might also like
Previous Previous
Feedback
Submit