Fiber Optic CCUS Monitoring Technology
Fiber optic profiling/injection profiling monitoring
Optical fiber leak finding monitoring
Optical fiber water monitoring technology
Fiber Optic Pipeline Monitoring
Fiber-Optic Interwell Hydraulic Fracturing Monitoring
Permanently Installed Fiber Optic Monitoring for Upstream Oil and Gas Applications
Product Series:600-1200hp diesel cementing trucks, 600-2500hp electric-driven cementing trucks
Maximum Displacement:2.1-3.0 m³/min
Maximum Operating Pressure:45-100MPa
Application Conditions:Cementing operations in oil and gas fields, pressure testing, and other fluid pumping operations
Contact Info.
Tel: +86 01057397888
Email: online@antonoil.com
Address: Swiss Tower, Cluster Y, Jumeirah Lakes Towers, Dubai, United Arab Emirates