Talk to Us TOP
Welcome to Anton Online Services, where we showcase Anton's products and technologies, offering real-time quality feedback and online support!
Turnkey solution stimulation services
Overview


Turnkey solution stimulation services


Service concept


Anton is committed to joint innovation with customers, through the close integration of geological engineering, precision engineering technology, lean operation management, to provide customers with integrated overall solutions, relying on mature project management experience, advanced and applicable technology combination, from price competition to value creation, through innovation, for oil and gas field customers to create breakthrough production and efficiency contribution.



Technical features

With production as the goal, on the basis of the understanding of the main controlling factors of oil and gas reservoir geology and productivity, and drawing on the latest technological achievements at home and abroad and the previous construction experience, targeted technical measures and combinations are proposed.




Application scenarios

Suitable for efficient development of unconventional oil and gas reservoirs such as tight oil and gas, shale oil and gas, and coalbed methane.


Innovation mode


  • Model innovation: jointly innovation with customers, innovative thinking and concepts, share preliminary understanding, share service resources, share talent teams, share research results
  • Service concept: The geology and engineering are closely combined and implemented in the research and implementation of schemes.
  • Service team: The supporting and stable geological engineering integrated team, including earthquake interpretation, reservoirs, geological orientation, drilling, fracturing, testing gas and other technical experts.
  • Precision technology: In -depth digestion of existing research results, according to the characteristics of oil and gas collection, preferably targeted technology and measures. The core is the maximum production capacity released by engineering technology through the progress of engineering technology
  • Fine assignments: Based on the purpose of increasing production, break the boundaries of the engineering, and dispatch the command uniformly to ensure the coordination and balance between various links, majors, and types of construction in construction



Service performance
  • In 2020, in the Southwest Shale Gas Changning H21-X technology bag, it drilled into a "largest oblique deep shale gas long level well" in PetroChina. The design cycle is 60 days. The cost -reducing effect is significant
  • In 2022, a total risk package of a platform for a platform in the North China Bureau of Platform's North China Bureau, the average daily output of 3 wells was 36,000 cubic meters, an increase of 44%year -on -year, of which the test output of 1 well was 198,000 cubic meters/day. Testing was tested. The highest record of producing Daniel
  • In 2023, XF11XX and XF16XX Geological Engineering Integrated Bagging Service in the Fangfu County Industrial Zone of Sinopec was integrated, XF11XX Jingchuang 7 project records, and the highest output record of Chuangfu County at the time
  • In 2024, the Grand Tower of the Great Tower of the Southwest Oil and Gas Field Development Division XX5 Well Hero Geological Engineering Integrated Bagging Service, the SXM group gas collection rolling evaluation won the high -yield industrial airflow, set a new record for block test production


You might also like >
Feedback
Submit