In the late stage of oilfeld development, on the one hand, water injection is necessary to replenish formation energy to improve oil recovery, On the other hand, due to reservoir differences, water coning happens in high permeability layer, resulting high water cut. Anton has a professional technical team, based on reservoir and geology, to provide integrated solutions of water injection and water control products and technology.