online service TOP
Drilling Industry Services
Cementing Technology Services
Oil and Gas Self-Healing Cement Slurry Service

Oil and Gas Self-Healing Cement Slurry

SERVICE

Temperature :≤180℃

Application scenarios:At present, for all oil wells suitable for self-healing cement slurry , during the cementing construction process, the parameters such as cement slurry density meet the design requirements, and the designed annular sealing length is 250-350 meters. , the occurrence of wellhead pressure, etc.

Density range(g/cm³):1.20~2.80

Download

Oil and Gas Self-Healing Cement Slurry

Feedback
Submit